C-3 Canal Coral Gables

SFI dredged and disposed of approximately 35,000 CY of existing sediment material from the subsurface of the C-3 Canal in Coral Gables, FL extending from SW 57th Avenue (S. Red Road) to SW Blue Road. ZEI was Subcontracted by SFI to haul and dispose of all of the contaminated dredge Sediment produced from this project.